Bridge maintenance at Boggy Creek Bridge

MOTORISTS are advised of changed traffic conditions on Giinagay Way to carry out bridge maintenance at Boggy Creek Bridge, north of Urunga.

Work will be carried out on this section of Giinagay Way from 7am to 6pm weekdays from Monday 31 October, and is expected to be complete by late November, weather permitting.

Single lane, alternating traffic flow arrangements will be in place while we carry out this work.

Traffic control and a reduced speed limit of 40km/h will be in place for the safety of workers and motorists.

Motorists should allow up to five minutes extra travel time during this work.

Motorists are advised to drive to conditions and follow the directions of signs and traffic control.

Transport for NSW thanks motorists for their patience during this time.

For the latest traffic updates download the Live Traffic NSW app, visit livetraffic.com or call 132 701.

Leave a Reply

Top