Changed traffic conditions on Pacific Highway from Coolongolook to Karuah

 

MOTORISTS are advised of continued changed traffic conditions on the Pacific Highway from Coolongolook to Karuah for bridge maintenance to be carried out in the northbound and southbound lanes.

Work to inspect bridges and carry out bridge maintenance will continue from Monday 19 July and is expected to be complete in two weeks, weather permitting.

Work will be carried out from 7am to 5pm on weekdays with single lane closures and a reduced speed limit of 40km/h in place, which may affect travel times.

Motorists are advised to allow extra travel time, drive to the conditions, and follow the directions of signs and traffic control.

Transport for NSW thanks motorists for their patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.

Leave a Reply

Top