Sanding against the sea: Precarious beach protection works continue at Jimmys Beach Myall Coast Myall Coast News Tea Gardens, Hawks Nest by News Of The Area - Modern Media - August 18, 2020August 18, 2020 Sanding against the sea: the MidCoast Council praised the work of the contractors who minimised sand erosion during challenging conditions last week. WITH the recurring rounds of storms, locals believed they were watching a losing battle at Jimmys Beach with the large five metre South East swell smashing the already eroded beach. However as pictured, the excavator expertly operated by “Steve” worked hard and fast in the wet and windy conditions, distributing sand along exposed points. MidCoast Council praised the work of the contractors who safely continued to work throughout the East Coast lows. The dredge also handled the swell and the Sand Transfer Station was pumping with only a small amount of sand lost. The Council continues to monitor the area to continue to deliver more sand to renourish the popular beach. By Sandra MURRAY